Come sun, rain or snow, the volunteers continued to work to get the railway ready for the 2021 running season. Five tons of ballast have been spread around the engine shed loop, here you can see the new ballast heading west from the station Mud, twigs and leaves cleared from the track to the tunnel, and the ditch dug out Work starts to dig a new cross drain to take water from the pond loop points to the lake The new cross drain completed on a snowy January day February saw major floods at the pond loop Two months later a new outflow ditch, complete with stone pitched base is complete (if a little muddy) Work to improve the engine shed sidings The works train bringing timber for the new lineside fence Fencing in progress The first section of the new fence complete, with new display boards on show ready for the first open day of 2021